Sale!

Repair Harness, Cooling Fan Electric Motor, Incl (3) 8 Inch Long Leads, Original 1u2z-14s411-Ada, Wpt-168

Original price was: $90.19.Current price is: $27.06.

SKU: M-8R607-125A Category:

Description

REPAIR HARNESS, COOLING FAN ELECTRIC MOTOR, INCL (3) 8 INCH LONG LEADS, ORIGINAL 1U2Z-14S411-ADA, WPT-168

Ford Mustang Years:

1998 (98), 1999 (99), 2000 (00), 2001 (01), 2002 (02), 2003 (03), 2004 (04)